1106 Perkins motor - Fuel Injection Pump Gear (Remove and install)
Removal Procedure

Use Tooling in order to rotate the crankshaft so that number one piston
is at top dead center on the compression stroke. Install Tooling through
the hole (X) in the camshaft gear (1) into the front housing. Use
Tooling in order to lock the camshaft in the correct position.
Remove the plug (4) from the cylinder block. Install Tooling into the
hole (Y) in the cylinder block. Use Tooling in order to lock the
crankshaft in the correct position. Do not use excessive force to
install Tooling. Do not use Tooling to hold the crankshaft during
repairs.

Apply sufficient pressure to the fuel injection pump gear (3) in a
counterclockwise direction in order to remove the backlash. Lock the
fuel injection pump (5) in this position. In order to lock the fuel
injection pump (5), loosen the locking screw (6) in the fuel injection
pump. Slide the spacer (7) into position (Z). Tighten the locking screw
(6) against the shaft of the fuel injection pump to a torque of 9 Nm (80
lb in).

Alignment of timing marks - Mark the gears (1), (2) and (3).
Identification will ensure that the gears can be installed in the
original alignment. Loosen the nut (8) for the fuel pump gear (3).

Install Tooling through two opposite holes in the fuel pump gear (3).
Tighten Tooling until the fuel pump gear (3) is released. Remove Tooling
from the fuel pump gear (3). Remove the nut (8) and washer from the fuel
pump gear (3). Remove the fuel pump gear.
Installation Procedure
Ensure that number one piston is at top dead center on the compression
stroke. Ensure that Tooling is installed in hole (Y) in the cylinder
block. Use Tooling in order to lock the crankshaft in the correct
position.
Ensure that Tooling is installed into the hole (X) in the camshaft gear
(1). Ensure that the shaft (9) of the fuel injection pump is clean and
free from damage. Ensure that the fuel injection pump is locked in the
correct position. Ensure that the fuel pump gear is clean and free from
wear of damage. If necessary, replace the fuel pump gear.
Install the fuel pump gear (3) to the shaft (9) of the fuel injection
pump. Ensure that the timing marks on the gears (2) and (3) are in
alignment and that the mesh of the gears is correct.
Install a new spring washer (10) and install the nut (8) to the shaft
(9) of the fuel injection pump. Apply sufficient pressure to the fuel
injection pump gear (3) in a counter clockwise direction in order to
remove the backlash. Tighten the nut (8) to a torque of 25 Nm (18 lb
ft). Unlock the fuel injection pump (5). In order to unlock the fuel
injection pump (5), loosen the locking screw (5) in the fuel injection
pump.
Slide the spacer (7) into position (Z1). Tighten the locking screw (6)
against the spacer to a torque of 9 Nm (80 lb in). This will prevent the
locking screw from tightening against the shaft of the fuel injection
pump. Remove Tooling. Install the plug (4) into hole (Y) in the cylinder
block. Tighten the nut (8) to a torque of 90 Nm (66.4 lb ft).
Checking backlash - Ensure that the backlash for the gears (2) and (3)
is within specified values. Lubricate the teeth of the gears with clean
engine oil. Install the front cover.
________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
_______________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
SPECS
LOADERS
MAINTENANCE
PROBLEMS
MF 1523
MF 1531
MF 135
MF 1547
MF 1635
231
231S
235
240
241
255
265
274
285
375
916X Loader
921X Loader
926X Loader
931X Loader
936X Loader
941X Loader
946X Loader
951X Loader
956X Loader
988 Loader
1655
GS1705
1742
2635
4608
1080
1100
2615
3050
3060
4708
5455
5450
5610
5613
DL95 Loader
DL100 Loader
DL120 Loader
DL125 Loader
DL130 Loader
DL135 Loader
DL250 Loader
DL260 Loader
L90 Loader
L100 Loader
6499
7480
7618
7726
1533
2604H
2607H
4455
4610M
4710
L105E Loader
L210 Loader
1014 Loader
1016 Loader
1462 Loader
1525 Loader
1530 Loader
232 Loader
838 Loader
848 Loader
5712SL
6713
6715S
7475
7615
7716
7724
8240
8650
8732
246 Loader
1036 Loader
1038 Loader
1080 Loader
856 Loader