________________________________________________________________________________
MF 5435,5440 gearbox with mechanical reverse shuttle - Shuttle
The mechanical reverse shuttle transmits drive from the Speedshift to
the input gear (1) of the GBA20 gearbox.
The mechanical reverse shuttle is located in the rear housing of the
input unit, behind the Speedshift.
It comprises:
- two helical gears (forward operation (5) and reverse operation (23))
fitted on the needle roller bearings (6) and (20);
- a double cone synchroniser (18) whose hub (2) is splined to the
secondary shaft;
- a secondary shaft (19) fitted on two ball bearings and supported by
the two bearings of the reverse shuttle unit;
- a selector rail/synchroniser control fork assembly;
- a double layshaft gear (15) constantly meshed with the reverse gear
(23) and the input gear (1) of the gearbox.
Massey Ferguson 5435, 5440 tractor gearbox shuttle
(1) Shim(s) (2) Synchroniser hub (3) Sliding coupler (4) Cone (brake)
(5) Forward driving gear (6) Needle roller bearing (7) Ring (8) Friction
washer (9) Ball bearing
(10) Set screw (11) Spacer (12) Friction washers (13) Reverse gear pin
(14) Needle roller bearings (15) Double reverse gear (17) Locking device
(18) Synchroniser
assembly (19) Secondary shaft (20) Needle roller bearing (21) Rings (22)
Coupling flanges (23) Reverse driving gear (24) Ball bearing (25)
Circlip (26) Housing (35)
Friction washer (39) Cones (brake)

Forward travel kinematics
The movement of the synchroniser sliding coupler (3) to the rear joins
the gear (5) with the shaft (19).
The gear (1) is splined to the layshaft.
The constant meshing
of gears (5) and (1) allows drive to be transmitted to the GBA-20
gearbox.
Reverse travel kinematics
The movement of the synchroniser sliding coupler (3) to the front joins
the gear (23) firmly with the shaft (19). Drive is transmitted via the
gear (23), the teeth of the
layshaft gear (15) and the gear (1).
Consequently, the drive transmitted
to the layshaft of the gearbox is reversed. If the input unit is removed
to replace the complete
unit or just the housing (26), it is necessary to shim the intermediate
shaft of the gearbox again after removing the input unit.
Disconnect the Massey Ferguson 5435, 5440 tractor between the engine and
the gearbox. Drain the gearbox and the rear axle. Remove the input unit.
Remove the
locking device, the selector rail and the shuttle fork. Remove the
Speedshift.
Reverse shuttle repair
Disassembling the layshaft gear (15) for reverse travel:
- Take out the set screw (10).
- Take out the pin (13).
- Remove the layshaft gear (15), the washers (12), the needle roller
bearings (14) and the spacer (11).
Disassembling the MF 5440, 5435 gearbox reverse shuttle:
- Remove the circlip (25). Remove the shim(s) (1).
- Drive the secondary shaft out of the gear/synchronizer assembly.
- Take out the gear/synchroniser assembly (18) from the housing. Remove
the washer (8), marking its positioning.
Place the gear/synchroniser assembly on a workbench. Separate: the gear
(5), the ring (7), the needle roller bearing (6), the cones (brake) (4)
and (39), the coupling
flanges (22), the gear (23), the needle roller bearing (20).
If
required, extract the ball bearing (24) from the secondary shaft (19).
Remove the washer (35), marking
its positioning.
Reassembling the MF 5435, 5440 gearbox reverse shuttle
Clean and check all components. Replace those that are defective.
Check that the ports and channels of the secondary shaft (19), the pin
(13) and housing (26) are not blocked.
Lubricate the secondary shaft, the ring (7) and needle roller bearings
(6) and (20).
If removed, place the washer (35) on the secondary shaft (19).
Fit the ball bearing (24) against the washer (35), using a press and a
makeshift sleeve (internal O = 47 mm; L = 60 mm). The sleeve is used to
push against the
internal cage of the ball bearing.
Assemble: the gear (5), the ring (7),
the needle roller bearing (6), the cones (brake) (4) and (39), the
coupling flanges (22), the gear
(23), the needle roller bearing (20).
Install the ball bearing (9) in the housing. Install the gear (5)
(23)/synchroniser (18) assembly and the washer (8) in the housing.
Turn the lubricating grooves of the washer (8) towards the gear (5).
Position the washer centrally (8).
Insert the secondary shaft (19) into the gear/synchroniser (18) assembly
through the bore in the front of the Massey Ferguson 5440, 5435 gearbox.
Turn the shaft from right to left and vice versa to partially engage the
splines of the secondary shaft in those of the synchroniser.
With the help of an operator, install the fitted unit on a table press.
Position a makeshift sleeve (internal O = 44 mm; L = 32 mm) under the
internal ring of the ball bearing (9).
Position the sleeve on the internal ring of the ball bearing (24).
Gradually fit the secondary shaft (19) securely using a press until
resistance is felt. Simultaneously check the gears rotate smoothly. It
is recommended to use a
press and sleeves to fit the secondary shaft under the correct
conditions, and to avoid exposing the ball bearings to excessive force
when fitting.
Install the shim(s) (1) removed during disassembly, and the circlip. If
it is necessary to shim the secondary shaft (19). Check the axial
clearance and rotation of the
gears (5) and (23). Manually check the rotation of the shaft (19).
Reassembling the layshaft gear (15) for reverse travel
Slide the needle roller bearings (14) separated by the spacer (11) into
the layshaft gear (15).
Place the assembled layshaft gear in the housing (26). Slide a washer
(12) onto each of its faces. Install the pin (13).
Lightly smear the thread of the set screw (10) with Loctite 242 or
equivalent. Tighten to a torque of 28 - 43 Nm.
Manually check the axial clearance and backlash of the reverse layshaft
gear.
Shimming the secondary shaft
Secure the unit in a vice fitted with protected jaws. Manually check for
clearance on the secondary shaft (19) in the housing (26). If there is
no clearance, temporarily
remove one or several shims (1).

Position the dial gauge feeler pin on the end of the shaft (19).
Pull hard on the secondary shaft (19) to correctly position the ball
bearing (24) against the circlip (25).
Set the dial gauge needle to zero. Pushing to bring the ball bearing (9)
up against the shoulder of the housing (26).
Depending on the clearance measured, select a new thickness of shim(s)
(1) to obtain a clearance of J1 = 0.05 to 0.20 mm.
If possible, shim the secondary shaft close to the minimum tolerance
value. Remove the circlip (25).
Position the definitive shim(s) (1) on the bearing (24). Install the
circlip (25). Check it is correctly fitted at the base of the groove.
Install: the Speedshift, the shuttle fork, the selector rail and its
locking device. Install the input unit. Top up the oil level in the
housings.
Check it using the gauge at the rear of the centre housing. Reconnect the tractor between the engine and the gearbox. Carry out a road test on all controls. Check the tightness of the seals and hydraulic unions.
________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
_______________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
SPECS
LOADERS
MAINTENANCE
PROBLEMS
MF 1523
MF 1531
MF 135
MF 1547
MF 1635
231
231S
235
240
241
255
265
274
285
375
916X Loader
921X Loader
926X Loader
931X Loader
936X Loader
941X Loader
946X Loader
951X Loader
956X Loader
988 Loader
1655
GS1705
1742
2635
4608
1080
1100
2615
3050
3060
4708
5455
5450
5610
5613
DL95 Loader
DL100 Loader
DL120 Loader
DL125 Loader
DL130 Loader
DL135 Loader
DL250 Loader
DL260 Loader
L90 Loader
L100 Loader
6499
7480
7618
7726
1533
2604H
2607H
4455
4610M
4710
L105E Loader
L210 Loader
1014 Loader
1016 Loader
1462 Loader
1525 Loader
1530 Loader
232 Loader
838 Loader
848 Loader
5712SL
6713
6715S
7475
7615
7716
7724
8240
8650
8732
246 Loader
1036 Loader
1038 Loader
1080 Loader
856 Loader