________________________________________________________________________________
Massey Ferguson 5410, 5425 Gearbox Speedshift - Repair
Disconnect the Massey Ferguson 5410, 5425 tractor between the engine and
the gearbox. Drain the gearbox and the rear axle if required. Remove the
engine clutch mechanism. Remove the input unit. Position the unit
vertically.
Removing and disassembling the front cover
plate
Remove the screws (2). Manually remove the shaft assembly (36), the ring
carrier (33) and the front cover plate (27).
Discard the seals (24), (46) and (47). Remove and discard the rings
(31). Remove the circlip (37).
Remove the tab washer (38) and washer (39). Separate the shaft (36) from
the ring carrier (33).
Remove the piston (48) by lightly tapping the cover plate with a wooden
block or using a jet of compressed air.
Separate and remove the ring carrier (33) from the cover plate (27).
Remove the seals (22) and (23) and discard them. Rivets (19) ensure that
the oil channels are sealed.

Removing, splitting and disassembling the planet carrier assembly
Remove the brake disc (21), thrust plate (20), Belleville washer (18)
and planet carrier assembly (50).
Put the planet carrier assembly on a workbench with the unit (9) turned
upwards. Remove the screws (3).
Separate the unit (9) from the hydraulic cover plate (25) while holding
sun gears (6) and (7).
The text and figures in this section concern the disassembly of a planet
carrier for a forward speed of 40 kph.
Remove the input sun gear (7), visually identifying the direction of the
lubricating grooves. Drive out the pins (8) using a drift and a hammer.
The pins are fitted tight in the thickest part of the planet carrier
with the lubrication hole turned towards the hydraulic cover plate (25).
Remove the planet gears (12). Recover needle roller bearings (16),
spacers (14) and washers (17). Remove the output sun gear (6). Remove
the splined hub (15).
Remove the intermediate plates (30), discs (42) and spring washers (43).
MF 5410, 5425 tractor clutch consists of: two friction discs; two spring
washers; three intermediate plates. Remove the piston (28) by lightly
tapping the cover plate
(25) on a wooden block or using a jet of compressed air. Remove the
seals (26) and (29) and discard them.

Reassembling the planet carrier
Clean and check all components. Replace those that are defective.
Lubricate the needle roller bearings (16). Make sure that the radial
holes and axial channel for
the lubrication of pins (8) are not blocked.
Massey Ferguson 5410, 5425 Tractor speed can be between 30 and 40 kph.
Each speed is obtained by turning the planet gears and sun gears of the
Speedshift
epicyclic gear train.
The sun gears have different numbers of teeth:
- sun gear (6): 36 teeth
- sun gear (7): 39 teeth

Put the output sun gear (6) in the unit (9), turning the sun gear
lubricating grooves towards face "F" of the unit. Install the needle
roller bearings (16), separated by a
spacer (14) in a planet gear (12).
Put an "assembled" planet gear in the unit, the 18-tooth gear turned.
Each double planet gear is identified with one, two or three punchmarks
on one of its faces
which is not necessarily the 18-tooth gear. In this case, make the same
marks on the aforementioned gear using an appropriate pen. A punchmark
corresponds to
the alignment of two teeth.
Position the washers (17). Centre the planet gear and washers with a
guide pin O 16 mm, L = 80 mm. Insert the pin (8) into the free bore on
face "F" of the unit (9).
Fit it partially set back, with the radial lubricating hole "a" turned
outwards and the end of central channel "C" turned towards face "F".
Repeat to assemble the two
other planet gears. During these operations, position the three planet
gears according to marks "R" so that they run in a line corresponding
with "O".
After final assembly of the pins (8), check again that the marks are
correctly aligned. Incorrect alignment may make it impossible to
assemble combined parts or
cause damage to the epicyclic gear train. Install the input sun gear (7)
with the lubricating groove turned towards the output sun gear (6).
Refitting the MF 5410, 5425 hydraulic cover Plate
Clean and check all components. Replace those that are defective.
Make sure that the three holes of the 17-bar channel on the hydraulic
cover plate (25) are not blocked.
Install the lubricated seals (26) and (29) and onto the piston (28).
Lubricate the mating faces of piston seals in the hydraulic cover plate.
Position the piston in the cover plate, turning the grooves towards the
operator.
Install the piston (28) using a plastic hammer, gradually and
alternately striking around the circumference of the piston.
Check that there are no fragments of "O" rings after fitting. Install
the splined hub (15).
Install an intermediate plate (30), a disc (42) and a spring washer
(43).
Continue stacking parts, ending with an intermediate plate. Arrange the
cut section of spring washers in opposite directions.
Assembling the planet carrier
Screw two diametrically opposed guide studs in the MF 5410, 5425
hydraulic cover plate (25).
Assemble the planet carrier unit (9) on the hydraulic cover plate (25)
while holding the sun gears (6) and (7).
Position the unit and the cover plate so that the balancing marks
(ground in marks) are on opposite sides as far as possible.
Refit the screws (3). They must be tightened to a torque of 14 - 20 Nm.
Strike pins (8) definitively against the hydraulic cover plate (25) with
a pin punch.
Check: the discs (42) are not compressed; the planet gears (12) and sun
gears (6) and (7) turn freely.
Install the planet carrier assembly (50) on the shaft (5). Position the
Belleville washer (18).
Position the thrust plate (20) in the housing (13). Install the brake
disc (21) on the planet carrier assembly.

Assembling and refitting the Massey Ferguson 5410, 5425 front cover
plate
Clean the cover plate. Make sure that the 17-bar channel and the
lubrication channel are not blocked. Check that the sealing rivets (19)
are present. Install the seals
(22) and (23) on the piston (48). Lubricate the mating faces of the
piston seals in the cover plate (27).
Position the piston in the cover plate, turning the grooves towards the
operator. Install the piston (48) using a plastic hammer, gradually and
alternately striking
around the circumference of the piston. Check that there are no
fragments of "O" rings after fitting.
If required, recondition the ring carrier (33):
- check that channels in the ring carrier are not blocked. The ball
bearing (40) should be inserted correctly in its hole;
- with a press and suitable fixture, fit:
- the needle roller bearing (32), 29.3 ± 0.1 mm from face F. Check that
the needle rollers turn correctly;
- the lubricated seal (10), 14.2 mm from face F. Ensure the seal does
not cover the decompression holes;
- the lubricated seal (11), 0.3 - 0.8 mm from face F. Ensure the seal
does not cover the decompression holes.
Check that plugs (34) and (35) are present on the cover plate. Smear
Loctite 510 or equivalent on the mating face of the ring carrier on the
cover plate, avoiding the
hydraulic ports.
Position the ring carrier on the cover plate, making
sure that the low pressure (17 bar) and lubrication holes correspond
respectively with those on
the cover plate; Fit the ring carrier (33).
Hold the ring carrier temporarily in place using three locally obtained
M8 screws. These screws are used to compress the ring carrier onto the
cover plate while the
seal is drying to ensure high-quality tightness of interfaces.
Check
that the lubrication holes on the shaft (36) are not blocked. If the
shaft needle roller bearing (65)
needs replacing. Slide the shaft in the ring carrier.
Install the washer (38) and circlip (37). Test-fit the new rings (31),
making sure they turn freely in the grooves. After this check, remove
the rings and smear with
miscible grease. Install the rings in their respective grooves, making
sure: that they do not exceed the circumference of the ring carrier;
their ends overlap correctly.
The slightest damage to rings may cause a leak followed by a pressure
drop and incorrect operation of the Speedshift.
Smear the washer (39) with grease and put it on the inner face of the
cover plate (27). Install the new seals on the housing (13). Manually
Install the shaft (36), ring
carrier (33) and front cover plate (27) assembly using the same
procedure as for removal. Install and tighten the screws (2) to a torque
of 25 - 35 Nm.

Extracting and replacing the primary shaft needle roller bearing
Extract the needle roller bearing (65) from the shaft (36 using a slide
hammer puller. Discard it.
Ensure there is no dirt inside the primary shaft (36).
Install a new bearing (65) 15 - 16 mm from face F of the primary shaft
using a press and suitable fixture.
After fitting, check that the bearing's needle rollers turn correctly.
Install the input unit. Install the hydraulic mechanism of the engine
clutch.
Reconnect the tractor between the engine and the gearbox.
________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
_______________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
________________________________________________________________________________________
SPECS
LOADERS
MAINTENANCE
PROBLEMS
MF 1523
MF 1531
MF 135
MF 1547
MF 1635
231
231S
235
240
241
255
265
274
285
375
916X Loader
921X Loader
926X Loader
931X Loader
936X Loader
941X Loader
946X Loader
951X Loader
956X Loader
988 Loader
1655
GS1705
1742
2635
4608
1080
1100
2615
3050
3060
4708
5455
5450
5610
5613
DL95 Loader
DL100 Loader
DL120 Loader
DL125 Loader
DL130 Loader
DL135 Loader
DL250 Loader
DL260 Loader
L90 Loader
L100 Loader
6499
7480
7618
7726
1533
2604H
2607H
4455
4610M
4710
L105E Loader
L210 Loader
1014 Loader
1016 Loader
1462 Loader
1525 Loader
1530 Loader
232 Loader
838 Loader
848 Loader
5712SL
6713
6715S
7475
7615
7716
7724
8240
8650
8732
246 Loader
1036 Loader
1038 Loader
1080 Loader
856 Loader